Min. Order: | 4000 Piece/Pieces |
---|
Model No.: BL046
Type: Cooling System
Material: Aluminum
Muffler Type: Center Muffler
Deck: Double
Surface Finish: Polishing
Weight: 200g-3000g
Cavity Number: 1
Machine: Cold Chamber
Packaging: carton, PE pallet, PE flow box, steel box, wooden pallet, container
Productivity: 5300/MONTH
Brand: NONE
Transportation: Ocean,Land,Air
Place of Origin: NINGBO
Supply Ability: 60000/MONTH
Certificate: ISO/TS16949:2009
HS Code: 7616991090
Port: NINGBO,SHANGHAI
Custom Aluminum High Quality HeatSink,
this LED Flood Light use ADC-12 as material.
In the process of Heatsink die casting, the correct adoption of die casting process parameters is the decisive factor for obtaining high quality die castings, while the die casting mould is the basis for the correct selection and adjustment of the relevant technological parameters. The casting shape and size precision, surface quality and internal requirements, casting operations smoothly etc., and mould design quality, manufacturing quality, specification, mold quality and maintenance quality has a direct relationship, so as to ensure the quality of die castings, first of all to monitor the quality of die casting mould
The next step is Quality control of die casting alloy
The raw materials of should be provided with the quality assurance of chemical composition and mechanical properties, and the chemical composition should be re examined
During smelting, operators should follow the operating rules carefully
Lamp Accessories: LED Heatsink Housing/Shell
Die Casting Machine: 280 ton
1 product per die
Material: ADC-12
Product Dimensions:220mm*170mm*48mm
Casting Precision: Grade GB-CT5
Machining Accuracy Screw Thread: H6
Technological Process: Die casting, Degate, Burring,CNC Milling, Polish, Powder Painting, Cleaning, Packing, Delivery
Control Measure: First item inspection, Routing inspection, Final item inspection, Incoming test and Outgoing quality control
Inspection Equipment: Calipers and Screw Gauge
Surface Treatment: Powder coating(electrostatic powder spraying)
Certificate: ISO/TS16949:2009
Lead Time: 30-35 days
Trade Term: FOB Ningbo