Min. Order: | 4000 Piece/Pieces |
---|
Model No.: L017001
Material: Aluminum
Deck: Double
Muffler Type: Rear Muffler
Type: Muffler Assembly
Weight: 200g-3000g
Cavity Number: 1
Surface Finish: Polishing
Machine: Cold Chamber
Packaging: carton, PE pallet, PE flow box, steel box, wooden pallet, container
Productivity: 5300/MONTH
Brand: NONE
Transportation: Ocean,Land,Air
Place of Origin: NINGBO
Supply Ability: 60000/MONTH
Certificate: IATF16949:2016,ISO14001:2015,ISO45001:2018
HS Code: 7616991090
Port: NINGBO,SHANGHAI
Aluminum Heatsink for Big ocean lamps A380,
the material of this part is A380, a most common die casting material, having good processability, this material have good thermal conductivity as the physical property.
In the Heatsink die casting process. techique workers and managers are the deciding factor in the quality management of the enterprise, is in the whole process of production and operation, quality function and activity process necessary to achieve product quality management, the function and process are realized by the people, who is in the leading position in quality control and quality management of products and plays the key role. Quality management requirements to ensure product quality and quality of work, quality of work depends largely on the ability and spirit "or" quality ", the relationship between them can be expressed as the quality of work, quality of products, the quality of personnel, personnel can be seen from this relationship (including decision-making, management, staff the quality of the team) is the basis of product quality.
The die casting criterion carried on this part is Grade GB-CT4, according to the required tolerance and dimensions in terms of the prints, the part has difficulty on CNC machining, especially the rough turning,
Aluminum Die Casting Lamp Accessories: Aluminum Casting of LED Lighting
Die Casting Machine: 350 ton
2 parts per die
Material: A380
Casting Precision: Grade GB-CT4
Machining Precision: ±0.02mm
Technological Process: Die casting, Degate, Burring, Shot blasting,CNC Milling, Spray Coating, Packing, Delivery
Control Measure: First item inspection, Routing inspection, Final item inspection, Incoming test and Outgoing quality control
Inspection Equipment: Calipers
Surface Treatment: Spray Coating
Certificate: IATF16949:2016,ISO14001:2015,ISO45001:2018
Lead Time: 30-35 days
Trade Term: FOB Ningbo