Min. Order: | 1000 Piece/Pieces |
---|
Model No.: L019700
Material: Aluminum
Muffler Type: Center Muffler
Deck: Double
Type: Exhaust System
Surface Finish: Vibratory Deburring
Packaging: carton, pallet
Productivity: 25000/MONTH
Brand: NONE
Transportation: Ocean,Air
Place of Origin: NINGBO
Supply Ability: 90000/MONTH
Certificate: IATF16949:2016,ISO14001:2015,ISO45001:2018
HS Code: 7616991090
Port: NINGBO,SHANGHAI
Aluminum Casting ADC12 Cylinder head cover is a part applied to oil system,
with the purpose to improve the stability, the comfort, the safety of driving.In order to increase the production efficiency, and ensure the control on such as the flash, the pin marks, and no appearance defects such as cold shut, short shot, crack, porosity, foreign material,
In the casting process should not only pay attention to the structure of the casting technology, advanced die-casting mould, die casting machine performance and structure quality, normative adaptability and selection of die casting alloy smelting process; more important role parameters attention pressure, temperature and time on the quality of castings. It is important to control these parameters effectively in the die casting process.
Based on such technology processes, the Motor End Cover will have nice consistency, stable quality, avoiding the issues detrimental to safety handling.
The material of this part is ADC12, a kind of material conforming to standard JIS H 5302-2000, this material has good fluidity, which is good for filling the mold while die casting.
Material: ADC-12
Cavity Number: 4
Process Technology: High pressure die casting
Product Dimensions: Customized
Casting General Tolerance: Grade GB-CT5
Surface Finish: Polishing, tumbling deburring
Flow Processes: Die casting, Trimming, Deburring, Vibratory Finish,CNC Milling, Cleaning, Packing, Shipping
Control Measure: Incoming Material Test, First Article inspection, Routing inspection, Final item inspection, and Outgoing quality control
Inspection Equipment: CMM, Caliper, Plug Gage,thread gauge
Application: garden instrument parts
Certificate: IATF16949:2016,ISO14001:2015,ISO45001:2018
Lead Time: 30-35 days
Trade Term: FOB Ningbo